Library Expansion Project

 

Construction from early 2013 to mid 2014

Here is What's Happening at the Library

Slide 1

Library Expansion Project

Slide 2

Increased user seating

Slide 3

Increased technology work stations

Slide 4

Increased group study rooms

Slide 5

Improved layout and floor spaces

Slide 6

Temp Library location - Carroll Street

Slide 7

Temp Library location - Carroll Street

Example Frame




The library will be undergoing  a $21.4 million state-of-the-art upgrade, renovation, and expansion, including:

•Expanded space by over 12,000 square feet
•Increased user seating from 203 to 281 seats
•Increased collection capacity from 120,000 to 140,000 volumes
•Increased technology work stations from 24 to 58
•Increased group study rooms from 1 to 7
•Added programs such as Emerging Technology, and Information Literary Classrooms

Goals for the New Library include:

•A Library transformed into a vibrant Learning Commons.
•Increased square footage
•Improved layout and floor spaces

Where to Study during construction

During Construction the library will be moving to the Carroll Building 4th floor.

How to Borrow Books During Construction

•Frequently requested books will be kept on campus

•Other books stored off-site can be requested

Transformation of the Library

Once the library is complete:

•Students will have direct access from 1st, 2nd and Lower levels.
•The lower level will be expanded by 10,000 square feet.
•There will be a welcome center which will be a new vibrant expansion of the Bedford entrance
 

 Medgar Evers Home Page | CUNY Libraries | MEC Campus E-mail | CUNY Home Page

 
 
1650 Bedford Avenue, Brooklyn, New York 11225 Tel: 718.270.4880
E-mail: CEIML@mec.cuny.edu

©2004-2005
Medgar Evers College/CUNY